New school classroom air control project

Air control project for new school classrooms

Project Background

A school in Longhua, Shenzhen, is the first school in Shenzhen to implement the 2016 school construction standards, and the project was completed in August 2019 and opened and put into use on September 2, 2019.

  1. Renovation brings formaldehyde, TVOC, benzene and other harmful substances, which in turn cause indoor pollution, the urgent need for long-term window ventilation;
  2. Some of the new classrooms are adjacent to the main traffic lanes, traffic caused by continuous noise dust pollution, open windows ventilation is more difficult to achieve;
  3. Classroom closed, carbon dioxide, germs, decoration pollutants concentration is not easy to decline. There is an urgent need for schools to improve complex classroom air and environmental problems, ensure that school starts on schedule, and create a high standard of teaching environment for students.

solution

For complex indoor and outdoor environment, we provide room temperature control, indoor new air, air purification, air sterilization four functions in one of the air environment machine.

Product selection: 6 ceiling air environment machine;

Number of products:1 / 75m2 classroom;

Effect:

Promote the rapid use of new classrooms, while ensuring that teachers and students can breathe oxygen-rich clean air without opening windows;

EBC ceiling air environment machine installation effect map