Huanggang Traditional Chinese Medicine Hospital
New classroom project
Project Background

A school in Longhua, Shenzhen is the first school in Shenzhen to implement the 2016 school construction standards. The project was completed in August 2019 and was put into use on September 2, 2019.
1. The decoration brings formaldehyde, TVOC, benzene and other harmful substances , which in turn causes indoor pollution, and it is urgent to open windows for long-term ventilation;
2. Some newly-built classrooms are adjacent to traffic arteries, causing continuous noise and dust pollution from passing vehicles , and it is difficult to open windows for ventilation;
3. The classroom is closed, and the concentration of carbon dioxide, germs and decoration pollutants is not easy to drop. The school urgently needs to improve the complex air environment of the classrooms, to ensure that the school starts on schedule, and to create a high-standard teaching environment for students.
solution:
For complex indoor and outdoor environments, we provide an air environment machine that integrates four functions: room temperature control, indoor fresh air, air purification, and air sterilization.